Swiss AviationTraining (SAT) will formally surrender its rights and entitlements as a Maintenance Training Organisation on 31 December 2016 and will transfer the management and conducting of all its technical training to Lufthansa Technical Training (LTT) with effect from 1 January 2017.

Your new contact for booking your training will now be

Lufthansa Technical Training

Email: Info@LTT.DLH.de

Phone: +49 69 696 2751

Thank you for the confidence and trust that you have placed in Swiss AviationTraining, and for the long-standing partnership we have enjoyed with you to date. We look forward to continuing our tried-and-trusted collaboration with you and LTT.


Lufthansa Technical Training

Extended Range Operations with Two-Engined aeroplanes (ETOPS)

Extended Range Operations with Two-Engined aeroplanes (ETOPS)

Oceanic routes and flights over remote areas may require flight further than one hour flying time from an en-route aerodrome. For a twin engined aeroplane this will require different approvals and procedures. The SAT ETOPS course covers the complex regulations along with planning and operational procedures required as part of an ETOPS operational approval.

Prerequisites

None

Objectives

After the course the participant states general ETOPS regulations, the detailed baseline of performance calculations and necessary procedures to enable a safe and efficient flight.  

Regulatory compliance

Read more
  • EASA GM1 SPA.ETOPS.105 ETOPS operational approval (AMC 20-6)
  • CS 25.901 ff

A certificate will confirm the attendance of the course.

Content

The classroom course contains the following topics 

  • ETOPS regulation
  • Routes and aerodromes in the ETOPS area of operations
  • Performance
  • Procedures

Duration

2 hours

Additional information

The training can be tailored to Non-ETOPS extended range operations.